Two engineers from the Japanese manufacture of the ACA correlator visited the lodging facility at the OSF (Operations Support Facility) and the ACA correlator room at the AOS (Array Operation Site) Technical Building in order to draw up preliminary plans for installation work. The picture shows the two engineers standing on the floor of the ACA correlator room. The surface of the concrete foundation for the correlator room is placed lower than the surrounding areas to make the raised floor on it. An air conditioning system with sufficient cooling capability in a low pressure atmosphere will be set up on the second floor.
NEW ARTICLES
2025 9.25
Winding Motion of Planet-Forming Spirals Captured on Video for the First Time
An international research team led by Tomohiro Yoshida, a graduate student at the Graduate University for Advanced Stud…
2025 8.8
The Universe’s Secret Harvest: ALMA Sheds Light on “the Cosmic Grapes”
Super high-resolution ALMA and JWST observations unveil unexpected substructure and underlying gas dynamics in a faint,…
2025 8.5
Discovery of Protoplanetary Disk Caught in Explosion Driven by Stellar Jet
A research team led by Masataka Aizawa of Ibaraki University studied a protoplanetary disk around the young star WSB 52…